East Coventry Elementary School
Project Quick Facts
- East Coventry Elementary School
- Owner: Owen J. Roberts School District
- Type of project: Replacement Elementary School
- Location: Pottstown, PA
- Approx. square footage: 85,800 sq. ft.
Project Details
MEP Engineers for the replacement elementary school that is located on the same site as the previous school. Alban Engineering included all work associated within the building of Heating, Ventilating, Air Conditioning (HVAC), and Plumbing Systems. The mechanical systems designed by Alban create spaces that are flexible, functional, energy efficient, and respond to the needs of the facility. The proper heating, cooling, ventilation, air exchanges, and Automatic Temperature Control Energy Management Systems have been provided for all spaces to create the appropriate thermal environment.
The HVAC and related Mechanical Systems are not only functional and responsive to the need, but are simple, reliable, durable, maintainable, and easily accessible. The HVAC System utilizes energy conservation techniques to the greatest extent possible, while maintaining comfortable control. The electric is served by utility pad-mount transformer. The main switchboard is sized to approximately 2000 amperes at 480/277 volts, three phase, and four wire service with an additional 25% spare capacity.