• Skip to main content
  • Skip to footer
AEI_Logo
  • Home
  • Services
  • Portfolio
  • Leadership
  • Careers
  • News
  • Contact
Home > Our Work > Sun Valley High School

Sun Valley High School

Project Quick Facts

  • Sun Valley High School
  • Owner: Penn-Delco School District
  • Type of Project: Multiple Renovations
  • Location: Aston, PA

Project Details

Alban Engineering, Inc. has completed many projects at Sun Valley High School in Aston, PA including a feasibility study, a hot water heater replacement, and other renovations around the school.

One of these renovation projects included the renovation of eight (8) group toilet rooms and four (4) single use toilet rooms during the summer of 2016.

Another project included a hot water heater replacement. The scope of work included the replacement of the existing Domestic Hot Water Generation Equipment including water storage and all associated piping located within the Mechanical Equipment room, roofing work, electrical work, controls and interlock etc. in a fully turnkey fashion.  Install all equipment per the manufacturer’s recommendations and guidelines.

The most recent project at Sun Valley High School include multiple renovations to the building. A multi-project approach was created to address the programming, systems, and architectural/engineering upgrades required throughout the school. By utilizing multiple construction projects, the process reduced the disruption to students during the school year and created more manageable projects during the summer months. To date, the cafeteria, media center, science labs, general classrooms, and restrooms have been renovated to provide new building systems and architectural/engineering finishes. A new skylight provides daylight into the cafeteria, while the media center was recon figured for collaboration. The current design process will address the fine and performing arts, as well as athletic spaces. Square footage includes 22,500 new square footage with 151,000 square footage of renovations.

Project Team

  • Jeff Alban, PE, LEED AP
  • Greg Drenning, PE
  • Steve Cramer

News

  • Company Retreat to Skytop 2022
  • Alban Engineering Celebrates 7 Years
  • Bay Brook Goes For Gold!
  • Reopening Schools – HVAC & Air Purification
  • 3 Reasons To Keep HVAC Running During COVID-19
View Photo Gallery

Footer

Contact –

303 International Circle, Suite 450
Hunt Valley, MD 21030
Phone: 410.842.6411
Email: info@albanengineering.com

Social –

  • Twitter
  • LinkedIn
  • Facebook
  • Instagram

© Alban Engineering, Inc. All rights reserved.